Re-Roofing Narrabri old Hospital.
Team had to Re-Roof about 1000m2. Some of the sections were close to 45 degrees, which makes it harder to walk on. Our professional team installed 10 brick chimney flashings, approximately 40lm of apron and overflashings in to brick sealed with polyurethane. All the ridges were covered with new rolltop ridge cappings.